Home Norge
  Løsninger
Produkter
Support - Service
Om oss
Nyheter
Marked
Kontakt   Norge
 
Løsninger  
 
Cadastral (eng)
 
 
Engineering (eng)
 
 
 HDS Workflows
 
 
 Roads
 
 
 Railways
 
 
  Automated 3D control for ballasting works
 
 
  High precision railway ballast construction
 
 
  Australian rail survey
 
 
  West Coast Main Line
 
 
  High Speed Railway
 
 
  Vancouver SkyTrain
 
 
  Vereina Tunnel - Switzerland
 
 
  Moving a railway bridge
 
 
  Tunnel profiles in subways
 
 
  Railway rapid transport
 
 
 Tunnel surveys
 
 
 Bridges
 
 
 Large Building Construction
 
 
 Airports and Stadiums
 
 
 Harbours and Docks
 
 
 Water Supplies
 
 
 Hydroelectric Power Plant
 
 
 Sewage collection
 
 
 Plants & Refineries
 
 
Monitoring (eng)
 
 
Building & Construction (eng)
 
 
Mining & Exploration (eng)
 
 
Asset & Facilities Mgmt (eng)
 
 
Agriculture (eng)
 
 
Aerospace (eng)
 
 
Automotive (eng)
 
 
General Industry (eng)
 
 
Other (eng)
 

Moving a railway bridge

Automated control when moving a bridge
A Leica TCA 1800 automatic target recognizing precision total station, controlled by the Leica APS Win Software, was in use when a bridge was moved by 23 metres below the Inter City Express main rail axis Mannheim-Frankfurt. This work on the Mannheim- Blumenau railway line was carried out by the Mannheim office of Bilfinger + Berger Bauaktiengesellschaft. The surveyor responsible for the measured control of the undertaking H. P. Echsle, describes this operation for our readers.

Click to download Moving a railway bridge (PDF, 179 KB) (PDF, 179.31 KB)
 
 
  Produkter
 
TPS2000
TCA1800 / TCA2003 / TC2003 Total Stations  mer info