Home Norge
  Løsninger
Produkter
Support - Service
Om oss
Nyheter
Marked
Kontakt   Norge
 
Løsninger  
 
Aerospace (eng)
 
 
Agriculture (eng)
 
 
Asset & Facilities Mgmt (eng)
 
 
Automotive (eng)
 
 
Building & Construction (eng)
 
 
Cadastral (eng)
 
 
Disaster & Emergency Management
 
 
Engineering (eng)
 
 
Forensics & Public Safety
 
 
General Industry (eng)
 
 
Mining & Exploration (eng)
 
 
Monitoring (eng)
 
 
 Man-Made Structures
 
 
  Automated Deformation Monitoring Apollo Bridge, Bratislava, Slovakia
 
 
  Volume computation, Bonfol special waste
 
 
  Track Monitoring Traunstein, Germany
 
 
  Real Time GNSS Bridge Monitoring
 
 
  Monitoring of Rail Tracks and Construction Site
 
 
  First Monitoring Project in Slovenia
 
 
  Owen Street Level Crossing, Tipton
 
 
  Urban Excavation
 
 
  Rail bridge reconstruction
 
 
  Burj Dubai
 
 
  Hong Kong Airport Express Line
 
 
  Jiangyin Bridge, China
 
 
  Northern Italian Reservoir
 
 
  GPS along the Danube
 
 
  Sydney Opera House
 
 
  Tsing Ma bridge - Hong Kong
 
 
  Yang-Pu bridge - Shanghai
 
 
  Akashi Strait suspension
 
 
  Vereina Tunnel - Switzerland
 
 
  Hornberg Reservoir
 
 
  Deformation monitoring
 
 
 Natural Phenomenons
 
 
Other (eng)
 

Hornberg Reservoir

GPS monitoring at Hornberg Reservoir, Germany
The dams and water reservoirs in the German province of Baden-Württemberg are resurveyed every five years as part of an ongoing monitoring programme. One of the sites being checked is the Hornberg reservoir, located in the southern Black Forest on a mountain peak 1050 m above
sea level. The reservoir feeds the Wehr hydroelectric power station, 630 metres further down and operated by Schluchseewerk AG. A study by the Geodetic Institute of the University of Karlsruhe set out to determine whether GPS measurements using Leica Geosystems’ new System 500 might be an economical and sufficiently accurate alternative to conventional terrestrial methods.

 
 

Produkter

Leica GPS1200+
GPS1200+ Systemer for landmåling   mer info